Manpower | 5.09 €/mq |
Movement | – €/mq |
Tools | 8.00 €/mq |
NEW NAUTILUS EVO | 7.67 €/mq |
Concrete | 23.04 €/mq |
Steel | 38.12 €/mq |
TOTAL | 81.92 €/mq |
COSTS (25%) | 20.48 €/mq |
TOTAL | 102.40 €/MQ |
Manpower | 4.00 €/mq |
Movement | – €/mq |
Tools | 8.00 €/mq |
Concrete | 32.00 €/mq |
Steel | 42.96 €/mq |
TOTAL | 86.96 €/mq |
COSTS (25%) | 21.74 €/mq |
TOTAL | 108.70 €/MQ |
FINITE ELEMENTS METHOD
New Nautilus Evo – Finite elements method