Skyrail reusable formwork is used for the creation of unidirectional slabs poured on-site.
SKYRAIL is a formwork system for the realization of monodirectional slabs for residential and commercial buildings.
SKYRAIL main formwork is designed to lighten the slabs made of concrete.
The system is an alternative to the traditional cemented slabs because it permits the creation of a monodirectional slab completely removing the brick lightening elements that interjects the ribs.
The empty volume SKYRAIL creates can be used as a technical department for hydraulic and electrical systems.
The spacers allow the right distancing between the beams for the housing of the domes
SK30 | SK60
ABS plastic that forms the formworks is extremely resistant, so that all Geoplast formworks can be reused for more than 100 times.
As SKYRAIL system is reusable, the formworks can be removed even after 4-5 days. In any case it is necessary to proceed with the operation of reduced stringing until the achievement of 28 days of pouring. This is needed in order to obtain the complete maturation of the concrete. The formworks removal should in any case be approved from the DD-LL on the basis of the concrete that was used.